germany ford motor vehicle
germany ford motor vehicle

Solving scale problems for the entire production factory

In 1993, the Ford automobile factory in Germany installed DEWEHA industrial series products in the entire production system, completely solving the problem of water pipe scale throughout the factory. After 8 months of use, the effects were obvious: pipe maintenance and filter usage were halved, and the discharged water did not pollute the environment at all.

Huaqin Rubber Industrial Group (Pirelli PIRC.MI)
Huaqin Rubber Industrial Group (Pirelli PIRC.MI)

Installed in 5 projects sequentially and proven effectiveness in 3 months

In Huaqin Industrial Park, DEWEHA will be installed in five projects (Pirelli, Lutong, Shenzhou, Bekaa, and Technology Center). The photographic records clearly show the changes in the pipes on the 54th, 34th, and 91st days of use, proving that we can actually achieve the effects of ``descaling, stain prevention, rust removal, and bacteria and algae control'' within the promised period.

PepsiCo Shanghai Baiji Foods
PepsiCo Shanghai Baiji Foods

The descaling effect is noticeable in 2 months after stopping the addition of chemicals.

Before installing the lithium bromide refrigerator unit, water was treated by adding chemicals, and the water was hard and had serious scale buildup. When DEWEHA was installed, chemical addition was stopped, and after two months of operation, the equipment was opened and inspected, and the descaling effect was very noticeable, and the equipment continues to operate stably to this day.

Weichai Power (Stock code: 000338)
Weichai Power (Stock code: 000338)

Introduced multiple systems such as dynamometer system and air compressor

Installed in the dynamometer system in June 2019, and added the third group in 2022. The stains on the inner walls of the pipes improved in two months, and a corrosion-resistant black oxide film (Fe₃O₄) was formed after 11 months. In the second stage air compressor, we confirmed that no new scale was generated and that old scale was peeled off.

Darchin Oil Field (CNPC)
Darchin Oil Field (CNPC)

80% reduction in scale on furnace tube walls

It will be in operation for one year from March 19, 2016 at Junan 4-2 Station. Furnace tube wall scale is reduced by 80%, improving mixing pump efficiency. The maintenance cycle for related equipment has been significantly extended, resulting in a significant reduction in direct and indirect production costs, reduced labor intensity for workers, and reduced safety risks.

Baosteel Group Wuhan Steel Factory
Baosteel Group Wuhan Steel Factory

Installed and operated in converter oxygen lance system

In January 2020, DEWEHA equipment was installed and operated in the converter oxygen lance system. Five months after installation, no new scale was observed on the heat exchanger plates of the plate heat exchanger, and most of the existing scale had been removed.

Nakashio Group Chlor-Alkali Plant
Nakashio Group Chlor-Alkali Plant

Large-scale line with pipe diameter DN600 and flow rate 1500m³/h

Installed with pipe diameter DN600, flow rate 1500m³/h, and 28 coils. After 4 months of use from March 21, 2020 to July 16, 2020, no new scale appeared, old scale was almost removed, and soft scale caused by fungi and algae was completely removed.

Shandongfang Circle Colored Metals Group
Shandongfang Circle Colored Metals Group

Peeling scale confirmed during refining furnace inspection

Confirmed peeled scale inside the furnace frame and furnace door of the refining furnace. This saves time (no need to cut or replace the water canister), reduces labor (no maintenance required by dedicated personnel), and reduces costs (no consumables or replacement parts, and very little power consumption).

Chikai Corporate Group Etsugi Suido
Chikai Corporate Group Etsugi Suido

Old scale falls off in production circulation cooling water system

Installed in January 2020 in the production circulation cooling water system. After 3 months of operation (January 11th to April 14th), the old scale fell off and no new scale appeared.

Baika Bioscience Technology Group (Stock code: 600873)
Baika Bioscience Technology Group (Stock code: 600873)

Confirmed scale prevention with seed tank cooling water

DEWEHA water treatment equipment was installed in the seed tank cooling water system of the 6th fermentation process. After 4 months, we confirmed that scale was effectively prevented and the scale removal effect was significant by recording data on the unpressurized return water and comparing photos of the control valve.

Jiangsu common dispute
Jiangsu common dispute

Removes old grime in 3 months/additionally introduced in 2024

In July 2020, it was introduced into the circulating cooling water system of the medium frequency induction furnace. Existing scale (old dirt) was removed after 3 months of use, and no new scale was observed. Another unit was added in June 2024, and the two units are maintaining stable effects and customer satisfaction is high.

Gansu Nishitetsu Group Waste heat power generation system
Gansu Nishitetsu Group Waste heat power generation system

Additive stopped and hard scale peeled off in 2 months

Prior to installation, maintenance was performed using additives, and the scale was severe, requiring irregular cleaning. Additives were stopped at the same time DEWEHA was installed on March 27, 2022. When the condenser return pipe was opened two months later (June 1st), the removed hard scale flowed into the rubber ball collection basket in loose pieces, and no new scale had formed in the system.

Dezhou Aili Biotechnology
Dezhou Aili Biotechnology

Hard scale falls off after 25 days of operation

Before the system was introduced, it required replenishment of city water and pure water, addition of chemicals, and treatment with acid cleaning once a month. DEWEHA was introduced on April 15, 2022, and after 25 days of operation, the hard scale on the inner wall of the return pipe fell off. After that, without any acid cleaning or chemical addition treatment, the cooling effect continues to fully meet the demands of the site.